Documents showing various items failing to meet the contract requirements.
Traffic control required by plans for 12th SE south of Clarksville St. (in progress as of 1-3-2021)
- Traffic control requirements
- Fire hydrants & gate valves
- Creek Crossing City has know about this for at least two years
- Contract time This was a four year contract
- Concrete work Shows driveways that were not replaced/repaired as per requirements
- Bypass pumping
- 40th SE
- 27 sewer tape gap in pipe
- 17th NE traffic control Traffic control never met the contract requirements
- Showing Mike Smith as Inspector on package 4 City manager was told by a staff member Mike Smith was not an inspector on this project
- Pavement backfill lack of compaction If 6th and other streets had been backfilled according to the contract the pavement would not have failed over the ditch line
- Open trench This requirement was ignored
- Manholes & clean outs Manholes were not properly constructed
- Made in USA
- Inspection issues 3rd party Very interesting & more comments on this item as time allows
Emails concerning the water & sewer project
- Email Carla UNFORTUNATE Email from the ex-city engineer to the contractor where she states it is unfortunate photos exist of the substandard work
Plans & Specifications – Contract Documents
- Package #4 – Final Plans (1 of 2)
- Package #4 – Final Plans (2 of 2)
- Package #4 – Final Specs
- Package #4 – Addendum #1 (1 of 2)
- Package #4 – Addendum #1 (2 of 2) This is where you find 195 plan sheets the city paid for detailing the required traffic control. These requirements were ignored.
- Package #4 – Addendum #2
- Package #4 – Addendum #3
- Package #4 – Addendum #4
- Package #4 – Addendum #5
- Package #4 – Bid Tabs Showing the dollar amount the contractor is being paid for each bid item